The project is organized in 6 workpackages that are managed by the operative units considering the following nomenclature:
- RU1 is the Università degli Studi di Pavia
- RU2 is the Università degli Studi di Genova
Moreover, Inside the RU2 the involved departments are:
- RU2a is the Dipartimento di Ingegneria Meccanica, Energetica, Gestionale e dei Trasporti
- RU2b is the Dipartimento di Architettura e Design
The project is based on the following workpackages:
WP1 -Design and test case definition.
WP2 – Dynamic analyses.
- WP2a - Integrated machine dynamic analysis: Dynamic simulations to define integrated machine behaviour and global efficiency.
- WP2b Dynamic building simulation (Leader: RU2b): hourly analyses to be performed on the significant test cases.
WP3 – CTES (Cold Thermal Energy Storage) analyses: will be considered: meeting cooling demand, staggered loading/unloading of PMC’s, optimisation of management operations, cost reduction and use of renewable sources.
WP4 – Building integration and water production: considering both simulation and experimental results.
WP5 – Exploitation and dissemination.
WP6 – Coordination.