The following deliverables are expected:
D1 (M9, RU1): Report on proposed and designed test cases
D2 (M15, RU1): Report on dynamic simulations
D3 (M24, RU2a): Report on the experimental results obtained with management trials including PCMs
D4 (M24, RU2b): Report on the integration of technology with buildings
D5, D6 (M12, M24, RU2a): Periodic reports on dissemination and valorisation activities
D7, D8 (M12, M24, RU1): Interim report (M12) and final project report (M24)